Best-Selling 12 Volt Deep Cycle Battery Solar - UPS Alarm Battery 6V 1.2Ah SL6-1.2 – SongLi

FEATURES

1.Features: AGM separator paper reduces battery internal resistance, prevents micro-short circuit, and prolongs cycle life.

2.Material: ABS battery shell material, impact resistance, corrosion resistance, high temperature resistance. High purity material.

3.Technology: The sealed maintenance-free technology makes the battery seal better, without daily maintenance, and the bumpy state prevents liquid leakage.

4.Volume: The battery is small in size and has a wide range of applications in life.

5.Application field: emergency lighting,alarm system,medical device,electric tool/toy,telecom system,ATM,EV battery etc.

QUALITY

1. 100% Pre-delivery inspection to ensure stable quality and reliable performance.

2. Pb-Ca grid alloy battery plate,Refined temperature-controlled curing new process.

3. Low internal resistance, good high rate discharge performance.

4. Excellence high-and-low temperature performance, working temperature ranging from -25℃ to 50℃.

5. Design float service life: 5-7 years

COMPANY PROFILE

Business Type: Manufacturer/Factory.
Main Products: Lead acid batteries, VRLA batteries, Motorcycle batteries, storage batteries, Electronic Bike batteries, Automotive batteries and Lithium batteries.
Year of Establish: 1995.
Management System Certificate: ISO19001, ISO16949.
Location: Xiamen, Fujian.

EXPORT MARKET

1. Southeast Asia: India, Indonesia, Malaysia, Philippine, Myanmar, Vietnam, Cambodia, etc.
2. Africa: South Africa, Algeria, Nigeria, Kenya, Mozambique, Egypt, etc.
3. Middle-East: Yemen, Iraq, Turkey, Lebanon, etc.
4. Latin and South American: Mexico, Colombia, Brazil, Peru, etc.
5. Europe: Italy, UK, Spain, Portugal, Ukraine, etc.
6. North America: USA, Canada.

PAYMENT&DELIVERY

Payment Terms: TT, D/P, LC, OA, etc.
Delivery Details: within 30-45 days after order confirmed.

PRODUCT SKU
Model Voltage Capacity Intemal Dimensions Terminal Weight Terminal
(V) (Ah) Resistance (mm) Type (kg) Direction
(mΩ)
SL2-4 2 4 9 46*25*100*106 F1 0.25 +   -
SL4-3.2 4 3.2 18 90*34*60*66 F1 0.4 +   -
SL4-3.5S 4 3.5 48*48*102*108 F2 0.41 -  +
SL4-4.5 4 4.5 16 48*48*102*108 F1 0.48 -  +
SL4-10 4 10 9 102*44*95*101 F2/F1 1 +   -
SL4-20 4 20 6 149*43*154*165 F17 2.2 -  +
SL6-1.2 6 1.2 55 97*24*52*58 F1 0.29 +   -
SL6-2.3 6 2.3 30 43*37*76*76 / 0.34
SL6-2.8 6 2.8 32 66*33*97*104 F1 0.5 -  +
SL6-3.2 6 3.2 35 134*35*61*67 F1 0.65 +   -
SL6-3.5S 6 3.5 70*47*101*107 F1 0.62 -  +
SL6-4E 6 4 30 70*47*101*107 F1 0.66 -  +
SL6-4 6 4 30 70*47*101*107 F1 0.68 -  +
SL6-4.5 6 4.5 25 70*47*101*107 F1 0.72 -  +
SL6-4.5H 6 4.5 25 70*47*101*107 F1 0.75 -  +
SL6-5 6 5 17 70*47*101*107 F1 0.8 -  +
SL6-4A 6 4 32 70*47*101*106 / 0.68 -  +
SL6-4.5A 6 4.5 28 70*47*101*106 / 0.74 -  +
SL6-6.5 6 6.5 21 151*35*94*100 F1/F2 1.05 +   -
SL6-7 6 7 18 151*35*94*100 F1/F2 1.1 +   -
SL6-7.2 6 7.2 16 151*35*94*100 F1/F2 1.15 +   -
SL6-7.5 6 7.5 14 151*35*94*100 F1/F2 1.18 +   -
SL6-9 6 9 12 151*35*94*100 F1/F2 1.3 +   -
SL6-8 6 8 99*58*109*113 F1 1.3
SL6-10 6 10 15 151*50*94*100 F1/F2 1.55 +   -
SL6-10H 6 10 15 151*50*94*100 F1/F2 1.65 +   -
SL6-12 6 12 12 151*50*94*100 F1/F2 1.75 +   -
SL6-12H 6 12 151*50*94*100 F1/F2 1.8 +   -
SL6-20 6 20 8 157*83*125*130 F17 3 +   -
SL12-0.8 12 0.8 200 96*25*62*62 AMP 0.34
SL12-1.2 12 1.2 95 97*43*52*58 F1 0.55
SL12-2 12 2 65 178*35*61*67 F1 0.8 +   -
SL12-2.3 12 2.3 60 178*35*61*67 F1 0.9 +   -
SL12-2A 12 2 72 70*48*98*104 F1 0.74 +   -
SL12-2.3A 12 2.3 60 70*48*98*104 F1 0.77 +   -
SL12-2.6A 12 2.6 40 70*48*98*104 F1 0.85 +   -
SL12-2.5 12 2.5 45 104*48*70*70 #VALUE! 0.9
SL12-2.8B 12 2.8 40 104*48*70*70 #VALUE! 0.98
SL12-2.8 12 2.8 50 67*67*97*103 F1 1 +   -
SL12-2.8A 12 2.8 50 132*33*98*104 F1 1 +   -
SL12-2.9 12 2.9 45 79*56*99*105 F1 1.05 -  +
SL12-3.2 12 3.2 55 134*67*61*67 F1 1.21
SL12-4 12 4 55 90*70*101*107 F1/F2 1.36 +   -
SL12-4.5 12 4.5 45 90*70*101*107 F1/F2 1.43 +   -
SL12-5 12 5 26 90*70*101*107 F1/F2 1.53 +   -
SL12-4A 12 4 45 195*47*70*76 F1 1.42 +   -
SL12-5A 12 5 30 140*48*102*103 #VALUE! 1.53 +   -
SL12-6.5 12 6.5 32 151*65*94*100 F1/F2 1.98
SL12-7 12 7 30 151*65*94*100 F1/F2 2.07
SL12-7.2 12 7.2 28 151*65*94*100 F1/F2 2.15
SL12-7.5 12 7.5 26 151*65*94*100 F1/F2 2.3
SL12-8.5 12 8.5 23 151*65*94*100 F1/F2 2.4
SL12-9 12 9 20 151*65*94*100 F1/F2 2.6
SL12-10A 12 10 32 151*65*111*117 F2/F1 2.8
SL12-10L 12 10 32 181*77*117*117 F2/F17 3
SL12-10 12 10 32 151*98*95*101 F2/F1 2.8
SL12-10H 12 10 32 151*98*95*101 F2/F1 3.12
SL12-12 12 12 20 151*98*95*101 F2/F1 3.25
SL12-12H 12 12 20 151*98*95*101 F2/F1 3.45
SL12-15 12 15 20 181*77*167*167 F17/F18 4.6 -  +
SL12-17 12 17 18 181*77*167*167 F17/F18 5.1 -  +
SL12-18 12 18 16 181*77*167*167 F17/F18 5.25 -  +
SL12-20 12 20 14 181*77*167*167 F17/F18 5.7 -  +
SL12-24E 12 24 24 166*175*125*125 F17/F18 7.3 -  +
SL12-24 12 24 15 166*175*125*125 F17/F18 7.6 -  +
SL12-26 12 26 14 166*175*125*125 F17/F18 7.8 -  +
SL12-28 12 28 12 166*175*125*125 F17/F18 8.2 -  +
SL12-24A 12 28 15 165*125*175*175 F18 8.1 -  +
SL12-28A 12 32 12 165*125*175*175 F18 9.3 -  +
SL24-1.2 24 1.2 180 194*43*52*58 F1 1.1
SL24-5 24 5 60 140*90*103*109 F1/F2 3.2 -  +
SL24-3.5 24 3.5 60 180*73*70*70 3.2
PACKING&SHIPMENT

Packaging: Kraft brown outer box/Colored boxes.
FOB XIAMEN or other ports.
Lead Time: 20-25 Working Days

MAINTENANCE CHECKLIST

As per the epidemic of COVID-19, many places are locked down or carrying out quarantine policy, which would cause the consumption ability going down and the longer the storage time of the cargoes/goods. Considering the charateristics of lead acid batteries,here is the lead acid battery maintenance checklist.

Recharge:

recharge voltage 14.4V-14.8V, recharge currency 0.1C, constant voltage charging time: 10-15 hours.

If not recharged, the batteries may not be working due to high internal resistance.

Recharge 30 mins of the dry charged batteries if it is stocked in warehouse more than one year; or the battery internal plates are oxidated in winter season with low temperature environment (recharge voltage 14.4V-14.8V, recharge currency 0.1C).

Do not turn the battery upside downin case acid leakage from the safety valve.

If leakage happening, please take the leaking batteries from the others and clean it; in case the acid causes batteries short circuit. After cleaning the leaking batteries, please recharge the batteries as above steps.

Songli Battery is a global lead-acid battery technology expert. In addition, we have become one of the world's most successful independent battery manufacturers.We sincererly thank you for your always trust on our battery products and service, and we are also improving ourselves and products to provide you more excellent products and service.

Recomended temperature for  lead acid battery maintenance:

10~25℃(High temperature would speed up the battery self-discharge). Kepp the warehouse clean, ventilated and dry, and avoid direct sunlight or excessive humidity.

Warehouse management principle: First in First Out.

Those batteries which are stocked in warehouse with longer time sold in priority,in case the battery voltage under low. It is better to divide different storage areas in the warehouse according to the arrival date as shown on the cargoes package.

Testing and inspecting of the sealed MF batteries’voltage every 3 months in case the batteries’ voltage under low or cannot start up.

Take the 12V series battery for instance, pleasure recharge the batteries if the voltage is under 12.6V; or the battery may not start up.

Lead acid batteries stocked in the warehouse more than 6 months, please do the voltage inpection and recharge the batteries before selling to essure the batteries in normal status.

Steps of battery recharge and discharge:

 

①Battery Charge: charge voltage 14.4V-14.8V, charging currency:0.1C,constant voltage charging time:4 hours.

②Battery Discharge:discharge currency:0.1C, End of discharge voltage 10.5V of each battery.

③Battery Recharge:recharge voltage 14.4V-14.8V, recharge currency: 0.1C,constant voltage charging time: 10-15 hours.

As bellowing picture shown, please coordinate with our sales team if there is any questions about the usage of the device and then we could provide you the operation video.

Steps of manual recharge and discharge operation:

3.2.1.Charge: charge voltage 14.4V-14.8V, charge currency:0.1C,constant voltage charging time:4 hours.

If operation video needed, please inquiry with our sales team. Thanks.

Discharge:

Quick discharge the batteries at 1C discharge rate until the battery voltage down to 10.5V. If operation video needed, please inquiry with our sales team. Thanks.